Prepare these inputs
- Pinned model/format, runtime, driver and kernel support.
- GPU memory/interconnect topology and tensor/expert parallel strategy where used.
- Context/concurrency envelope and input modalities.
Decisions and sequence
- Check architecture and format support before attempting capacity arithmetic.
- Measure load, warmup, prefill, generation and saturation separately.
- Record host RAM, storage and networking needs as well as GPU memory.
The first useful deliverable
A measured execution profile showing peak resource use, supported workload and remaining headroom.
Failure modes to catch
Aggregate memory across several GPUs is not automatically one usable allocation. Unsupported kernels, communication overhead or load-time peaks can prevent an apparently sufficient system from running the service.
How this follows the paper
Read The Independent Institution, sections 5. The role and sequence above are practical preparation derived from those sections; any newly proposed commercial arrangement still needs its own confirmed terms.
Computraq participation status
Computraq is in prelaunch. This guide interprets the proposed operating model in The Independent Institution; it does not establish current hosting, paid booking, provider integration, partnership or a guarantee of service. Use the paper, original slides and expression-of-interest form to prepare a concrete contribution.